Facilities
Maru-a-Pula is located on a beautiful, well-shaded campus situated in the heart of Gaborone, Botswana. The campus is home to academic, sport, arts, and boarding facilities as well as staff housing. These pages provide a full listing of campus facilities and recent improvements at Maru-a-Pula.
Maru-a-Pula contains the following within its 50 acre campus:
Classrooms Available
- English (4)
- French (Modern Languages) (1)
- Setswana (1)
- Business (1)
- Mathematics (4)
- Geography (3)
- History (3)
Art Facilities
- 2 fully-equipped art rooms
- Additional studios
Science Laboratories
- Physics (3)
- Chemistry (3)
- Biology (3)
Computer Facilities
- PC networked labs (3)
- Wireless campus
Library
- Equipped with computers and study space
Audio-Visual
- High capacity AV centre
- Roof-mounted digital projector
- Wall-size screen
- Full stereo sound system
Music and Drama
- Maitisong
- Additional studios
- Moving Space drama room
- Music room
- Practice rooms (2)
Sports
- Tennis Courts (2)
- Swimming Pool
- Netball Courts (2)
- Gymnasium
- Athletics Track
- Soccer Field
- Rugby Field
- Softball Diamond
- Basketball Courts (2)
- Volleyball Courts (2)
Boarding Facilities
- Girls Boarding house
- Boys Boarding house
Recent Improvements
- All the old flat-roofed classrooms (10 in all) are now air-conditioned; roofs are sealed; walls plastered and painted; all old desks and chairs have been replaced; old metal doors have been replaced by aluminum frames with smaller window panes; most if not all of the old beat-up lockers have been removed and replaced by new lockers situated on outside walls throughout the campus.
- Both the Boys and Girls Boarding Houses are served by air coolers.
- The old chain-link fence has been supplemented by an electrified fence around three- quarters of the campus, the front quarter now has a handsome, forest green, palisade-style fence along the road leading in -- from both directions- to the MaP entrance at which an electronic boom has now been put in place.
- The cinder dust track has been buried and amalgamated while the track surface has been properly graded.
- The basketball courts have been re-surfaced.
- The swimming pool has been completely re-tiled/ re-surfaced.
- The front-of-school parking lot has been paved.
- All the computer-lab equipment in the school has been replaced in the last year and our internet connection is much faster.
- The library has been thoroughly renovated on both sides, with new furniture and all new computers.
